62 f-85 cutlass
#121
Back from the dead
Finally Decided to revive this project, it’s been almost 4 years since I’ve worked on it. So far I got the 4l80e up against the motor so I could figure out a crossmember and measure for a driveshaft. Plan is to do drivetrain first, I’m going to put my turbocharged 350 from the 66 in the 62 for now but still plan on building a big block blower motor.
#126
I ordered a tranny crossmember from chassisworks but it’s been over a month and it hasn’t shipped yet. Was going to start with that then order a driveshaft and new rear shocks and springs. I got the turbo motor out of the 66 and will put that in after I freshen it up.
#129
I am looking to buy new rear wheels. Looking for a 15x12 with 4.375 backspacing. I wanted to stay with an old school look but et mags cannot make the wheel I want in the specs I need, might be willing to go with a modern wheel but would have to be a bead lock and I am only wanting to spend as much as $400 a wheel. Show me what you guys think would look good or just tell me a brand to look into.
#130
I did buy tires, shocks and springs recently to make it a roller again. I have picked up a few smaller things here and there as well
Last edited by young olds; May 2nd, 2019 at 04:33 PM.
#135
I noticed I never showed off the wheels and tires I bought for the rear. Car has been in storage since last summer, “ownership” keeps bouncing back and forth between my dad and I since neither of us can bring ourselves to sell it.
#137
I want to say they are billet specialties( first name that came to mind) and pretty sure I did 15x12. No real plans but I would like to bring it home or get it to my dads at some point, we’d both like to see it finished.
#141
Not much of an update but I like to let you guys know I have not given up on her. It looks like one of my scorpions is leaving Saturday which will give me room to bring the cutlass home. I also recently was given a great deal on a low mile Mullins Vega box.
#146
I have two cars I would like to sell but need a bit of work first, once they are gone I can start. I’m thinking another month or two to get them squared away and gone. The plan is start with easier projects, steering(now that I finally bought a box), brake master and lines, driveshaft etc.
Thread
Thread Starter
Forum
Replies
Last Post
BSiegPaint
General Discussion
10
March 1st, 2019 03:15 PM